ABOUT US
Installed Capacity (MW)
Year of Commissioning
Annual Energy Production from Wind (MWh)
ENERCON E-101-3,05 MW
Avoided CO2 per Year (Tons)
Equivalent Household Consumption
Wind farm Zistersdorf Ost is fully owned by ContourGlobal Ventus Power Holding GmbH. It comprises three ENERCON E-101 turbines (3 MW each), providing a total installed capacity of 9.15 MW and an annual electricity production of around 19 GWh. It is located 35 km north of Vienna, in the municipality of Zistersdorf, and is connected to the medium-high voltage grid operated by Netz Niederösterreich. Commercial operations began in July 2014. A fixed feed-in tariff is granted for 13 years.