ContourGlobal Windpark Scharndorf GmbH

29.3

Installed Capacity (MW)

2024

Year of Repowering

81,288

Annual Energy Production from Wind (MWh)

8x

3x Senvion M122-10,2 MW; 2x Vestas V117-6,9 MW; 1x V150-6 MW; 1x V136-4,2 MW; 1x V80-2 MW

48,773

Avoided CO2 per Year (Tons)

28,451

Equivalent Household Consumption


Wind farm Scharndorf is owned by ContourGlobal Beteiligung GmbH, a wholly owned subsidiary of ContourGlobal Erneuerbare Energie Europa GmbH. It consists of eight turbines: three Senvion M122 (3.4 MW each), two Vestas V117 (3.45 MW each), one Vestas V150 (6.0 MW), one Vestas V136 (4.2 MW), and one Vestas V80 (2.0 MW), with a combined installed capacity of 29.3 MW and an annual generation of approximately 81 GWh. It is located 30 km east of Vienna, in the municipality of Scharndorf, and is connected to the medium-high voltage grid operated by Netz Niederösterreich.

The first turbine began commercial operations in 2003, followed by several repowering phases. The final repowering stage was completed in 2024. The majority of the turbines operate under a fixed feed-in tariff scheme for 13 years, while the more recent turbines are covered by 20-year Contracts for Difference (CfDs).


Our use of cookies

We use necessary cookies to make our site work. We’d also like to set optional analytics cookies to help us improve it. We won’t set optional cookies unless you enable them. Using this tool will set a cookie on your device to remember your preferences.

For more detailed information about the cookies we use, see our Cookie policy


Analytics cookies

We’d like to set Google Analytics cookies to help us to improve our website by collecting and reporting information on how you use it. The cookies collect information in a way that does not directly identify anyone.

For more detailed information about the cookies we use, see our Cookie policy

: